Week 1 of our kitchen renovation has come and gone and we are actually right on schedule! There were a couple minor blips – nothing that really could have been avoided, and thankfully, nothing that really set us back at all.

Here’s where we are at the end of Week 1:

  • Demo = Done
  • Initial Plumbing and Electrical = Done
  • Drywall work = Done
  • Backer board installed on the floors = Done
  • Cabinets (and hardware) installed = Done
  • Painting (except for trim and a few touch ups) = Done

Here’s what it was looking like last night. The cabinets are slightly darker in real life. The paint is a really light gray/beige. We wanted to keep the walls and floor light to balance out the dark cabinets and counter tops.

The major project for this week is getting the floor tiled. Should be interesting! One week down, 1-1.5 weeks left to go…

Advertisements

One Response to The Kitchen Project: Progress, Week 1

  1. Jen says:

    The cabinets look so great!

Leave a Reply

Fill in your details below or click an icon to log in:

WordPress.com Logo

You are commenting using your WordPress.com account. Log Out / Change )

Twitter picture

You are commenting using your Twitter account. Log Out / Change )

Facebook photo

You are commenting using your Facebook account. Log Out / Change )

Google+ photo

You are commenting using your Google+ account. Log Out / Change )

Connecting to %s

%d bloggers like this: